Commercial intelligence for erection engineering & heavy lifting — the decisions, sequences, and risks behind the world's most complex lifts.
Jul 25, 2026
•
6 min read
A €2.6 billion vessel. A four-platform award signed before it could lift anything. An eleven-year payoff.
Jul 12, 2026
The engineering calculation couldn't be checked before it started. Neither could the price.
Jun 28, 2026
8 min read
A 656,000-tonne concrete base. A weather window measured in days. Ten tugs that could not wait.
Jun 14, 2026
Three contracts. Three methods. One artificial island that had to be exactly right before either side could finish.
May 31, 2026
Two lifts. Twenty months apart. One sequencing dependency that still shapes £44 billion of North Sea decommissioning.
May 18, 2026
5 min read